Solar Photovoltaic Grid-Tied 5 kWp - Hotel Location: Ibague, Tolima, Colombia Developed: 2017 Purpose: Supply, Installation and commissioning of 5 kWp grid-tied system for self-consumption.
Hospital off grid in Bonne Fin, Haiti Location: Southern Haiti, Hospital Lumiere Developed: 2018 Purpose: In order to alleviate these issues, SUNWAY spearheaded the construction of a off grid solar system. We designed the AC-coupled microgrid with the goal of enhanced resiliency for the critical med...
70KW Solar Plant Project in Nara, Japan(Smart Solar Module) Location: Nara,Japan Developed: 2016 Purpose: Supply, Installation and commissioning of 70 grid-tied system for self-consumption.